aa区一区二区三无码精片-无码专区狠狠躁躁天天躁-国精产品一线二线三线av-亚洲久热无码中文字幕人妖-亚洲精品久久久久av无码

Welcome to Changzhou Ruide Drying Engineering Technology Co., Ltd!

Exhibition News

?

How to maintain the mold head of the steel strip granulator system

Updatetime:2024-05-07   Visits :1407

Steel strip granulator is a device that can quickly melt and granulate materials on steel strips. The mold head is an important component, how should it be maintained after use?

In order to prevent the steel strip granulator from shutting down due to mold failure, it is necessary to operate correctly and take protective measures to ensure that the mold can be used at any time. Carelessness or misoperation during maintenance, cleaning, or adjustment is the main cause of mold damage, therefore strict training is required for all personnel who come into contact with the mold.

When there is pulsation during the extrusion of the steel strip granulator, it is impossible to continuously adjust the flow blocking block of the slit die. He also needs to be able to determine whether the inlet pressure exceeds the limit based on the measurement results. Additionally, it should be noted that the mold or flow block cannot be adjusted quickly and should be replaced appropriately in adjacent areas, otherwise it may damage the bolts and flow block. The scraper used in manufacturing removes the molten material from the mold to avoid scratching the entangled mold, and the gap width of the mold should also be measured using soft materials such as brass gauges.

When frequent mold replacement is required, especially during film and sheet extrusion, it is necessary to hire someone to operate. Some people have experience in disassembling, inspecting, and installing new molds before use. The disassembly, cleaning, repair, and maintenance of molds should be carried out at designated locations, which should be far away from the production site. Pay attention to cleaning the steel strip granulator and pad it with corrugated cardboard. A small crane should be equipped during use. When lifting by hand, the chain of the pulley assembly often damages the mold. To avoid this danger, it is possible to consider using hemp rope, which can greatly shorten the time for mold replacement.


Contact Us
Address:Zhenglu Town Industrial Park, Tianning District, Changzhou City, Jiangsu Province
Sales Hotline: Manager Wu +86-15861192272
Technical Hotline: Manager Liu +86-13861264255
Phone: +86-519-68231907
Website: www.cq-66.com
E-Mail: rd@jsdryer.net

Technical

Sales
Copyright? 2024 Changzhou Ruide Drying Engineering Technology Co., Ltd .All Rights Reserved
主站蜘蛛池模板: 佛学| 洱源县| 印江| 铜梁县| 巨鹿县| 辽宁省| 凤庆县| 阿合奇县| 潜山县| 南华县| 图们市| 苏州市| 昭苏县| 乐昌市| 佛坪县| 内江市| 荔浦县| 江山市| 天水市| 东阿县| 高州市| 尤溪县| 安丘市| 营口市| 手机| 琼中| 临汾市| 循化| 嘉义市| 南木林县| 凤山县| 鄂托克前旗| 信阳市| 博乐市| 抚远县| 鹿邑县| 富锦市| 凌云县| 无为县| 台湾省| 丹东市|